Phase 1 of the brew stand build is complete.  Up next we need to mount the pumps and wort chiller, build a mash tun and then paint everything.  Hope to have more done next weekend.

Phase 1 of the brew stand build is complete.  Up next we need to mount the pumps and wort chiller, build a mash tun and then paint everything.  Hope to have more done next weekend.