The brew stand is almost done!  The stainless gas lines got lost in shipping so we still need those but other than that just a few small things need to be done to wrap it up.  We need to fabricate a cover for the pumps, buy a second pump, finish plumbing the propane lines and build a HLT.  Then it will be brew time.