The brew stand is almost done! The stainless gas lines got lost in shipping so we still need those but other than that just a few small things need to be done to wrap it up. We need to fabricate a cover for the pumps, buy a second pump, finish plumbing the propane lines and build a HLT. Then it will be brew time.
